Pothole Repair Trial Performance Report Update after 21 months

Click the image above to read the full report

Report by Jeff Waters - Waters Surfacing

Our latest report is just in. Click the image above to read the full report.

“RSP ‘Road Patch’ cold mix is manufactured using 97.5% recycled materials which makes it one of the most sustainable pothole repair mixes on the market.”

Our products have been in the ground now for over 21 months and have been regularly checked on through this time. We would like to thank all those involved in the initial trial and subsequent follow up checks. Their willingness to provide access to the site and for their time in helping to run a professional and non bias trial over a prolonged period of time is greatly appreciated.

“Contractors should use RSP ‘Road Patch’ cold mix where long-term performance (> 21 month) is required.”

  • at 3 months: All four RSP ‘Road Patch’ cold mix repairs were still in place and performing well.

  • at 9 months: The RSP ‘Road Patch’ cold mix is still performing well, 9 months after it was laid. 2. Hot mix pothole repairs were failing all around the RSP cold mix trial repairs.

  • at 14 months: The RSP ‘Road Patch’ cold mix has worked well in the trial on a very difficult site with poor drainage, significant detritus and large numbers of Aggregate Trucks and should work well on road repairs. Some of the hot mix repairs constructed by others adjacent to the RSP ‘Road Patch’ cold mix repairs in the past 14 months have already failed and been repaired again.

  • at 21 months: The RSP ‘Road Patch’ cold mix repairs are still performing well 21 months after they were constructed. Most of the repairs constructed by others using hot mix asphalt and other products have failed at least once during the monitoring period.

In addition to the hard surface testing,

“RSP claims that ‘Road Patch’ cold mix works on gravel roads. Two trial patches have been constructed on a gravel driveway and after fourteen months they are still performing well.”

May 8th 2023

Jeff Waters, General Manager, Waters Surfacing Consultants

Previous
Previous

The perfect solution for a pothole near you

Next
Next

Independent report shows Road Patch performs in tough conditions - 14months in.